Lodi • San Joaquin & Sacramento counties
One-day shower replacement starts with a plan.
Some focused shower replacements may be installed in as little as one day after preparation. Let us review your bathroom and explain the schedule for your scope.
BBB Accredited • A+ Rated ISD Construction LLC
Operator of One Day Bath California.

What “one day” includes
The installation day is one part of the project. Measurements, product selection, ordering and preparation happen beforehand. A short installation schedule depends on the selected system and the condition of the existing bathroom.
A focused replacement that keeps the basic footprint may be a candidate. Layout changes, hidden damage, plumbing work or a wider room remodel can require more time.
Your bathroom sets the schedule.
We’ll discuss the expected timeline for your specific scope. “One day” is not a promise that every bathroom or every part of a full remodel can be finished in a day.
Questions to ask about your installation
When does the one-day timeline start?
Ask which tasks happen before installation day, whether materials are ready and what preparation is included in your schedule.
What if damage is discovered?
Hidden conditions may change the work and timeline. Ask how additional work will be explained, priced and approved.
When can I use the new shower or tub?
Use depends on the installed products and any required curing time. Follow the installation team’s instructions for your specific system.
Let’s talk about your bathroom
A better bathroom starts with a conversation.
Tell us what you want to change and where your home is located. We’ll discuss the next step for your project.
Based in Lodi, serving San Joaquin and Sacramento counties. Ask us about projects in surrounding areas.
Request your free estimate
Share your contact details and a few words about your project.
By submitting, you’re asking us to contact you about your project. Read our privacy policy.